PREVENTIVE MAINTENANCE IN PALM OIL MILL

Preventive Maintenance Manual in Palm Oil Mill



Palm oil mill is one of complex plant which consist a lot of machinery and equipment to be maintained in good working condition. To ensure continous operation and achieving desire throughput proper Preventive Maintenance System is needed in Palm Oil Mill.

This preventive maintenance manual is a “must have” for all maintenance professionals. It is a unique resource for improving maintenance management processes and learning smart preventive maintenance (PM), condition monitoring, inspection and troubleshooting techniques on a wide variety of components including pumps, motors, gears, bearings, chain, pipes and valves, couplings, seals, fans, lubrications, lifting equipment, hydraulics, pneumatics, compressors, steam, electrical systems, etc. The condition monitoring and PM techniques are presented in the book together with inspection tools and examples of how to inspect and prevent failures for a number of standard components. The maintenance manual carefully explains how to set up and improve a preventive maintenance program in palm oil mill . The reliability manual teaches the reader how to organize condition monitoring, lubrication, alignment, cleaning, and other preventive maintenance systems into one orchestrated process.



This manual will give you an explanation of the practical methods for carrying out preventive maintenance in Palm Oil Mill. This manual consists of three series, the first series discussed the Preventive Maintenance system for palm oil mill, a second series explains the basics of machine operations and components in the machine and the relation between it. The third series will provide you complete maintenance checklist for every station and machinery which include the diagrams, forms and checklist . More than 100 check list, workorder form , prventive maintenance table are included in this manual.

We hope that this manual will provide a greater benefits to Palm Oil Industry.


Manual Content

1.  Preventive Maintenance in Palm Oil Mill - First Series 
2.  Basic Operation & Maintenance in Palm Oil Mill - 2nd Series 
3.  Preventive Maintennance Manual in Palm Oil Mill - Third Series  

Total Price :  RM 450.00 ( Malaysia ) / USD 200.00 ( outside Malaysia)

For easy payment we accept RM 150.00 for deposit and balance payment RM 50.00

How To Order :

There are three methods to order :-

1. Fillup the following form :  ( below)
2. SMS your email and contact number to 0128369523

How to Make a Payment :

There are three methods to make a payment :

1. We accept payment bankin through ( RHB, Islamic Bank, CIMB , Maybank)
2. We accept Payment bankin through credit cards by using paypal. ( Mastercard, Visa any Creditcard)
3. We accept money transfer through Western Union .
Pam Oil Mill O/M Form Order/Enquiry
Name*

Address*

Street Address

Address Line 2

City

State / Province / Region

Postal / Zip Code

Country
Phone Number*

###
-
###
-
####
Email*

Please tick your order*
 Palm Oil Mill Module of Technical Design 
 Palm Oil Mill Module of Operation 
 Palm Oil MIll Module of Checklist 
Module Name ( Please Refer Above ) Please write
down here


Terms and Condition

1. All prices are quoted in RM/USD and payment is not accepted in any other currency.

2. When an order is placed we will send you an email confirming receipt of the order, this is an acceptance of your order.

3. We reserve the right to cancel an order you have placed but without cost to you.

4. As the products we supply are bespoke to you and cannot be resold, we have no refund policy.

5. One AIM Synergy Solution cannot be held responsible for the accuracy of information that has been provided by you. We cannot be held responsible for inacurracy of quotation given by others for work based on planning drawings only, all specified elements and structural detailing is only within our DESIGN SYSTEM.

7. All Plans, Notes andl Calculations will be delivered to you by email in PDF format. Paper versions will be delivered using Recorded Delivery. All other format for drawing as per requested and additional charge will be imposed.

8. This website or any part of time may not be reproduced or used by others without our express written consent.

9. One AIM Synergy Solution takes every reasonable effort to ensure all information on this site is accurate. We do not assume any liability or responsibility for any error or omissions or for information on the site.

-------------------------------------------------------------------------

Payment and Delivery


DEBIT AND CREDIT CARD PAYMENT

We accept most of the credit and debit cards through secure Paypal system. You don't need to be register with Paypal to make orders in our shop. Many customers however, find Paypal an efficient tool to track orders, claim refunds or report problems with delivery.


PAYPAL

Customers registered with Paypal can enter their login details during the checkout process and follow with payment on secure Payal website.


WESTERN UNION. BANK TRANSFER and CHEQUES

Customers not willing to pay by cards, can transfer the payment directly from their bank account. Please contact us for details. for Western Union please e-mail your details of order to director.engineer@yahoo.com we will give our details for payment via western union.


DELIVERY TIMES


1. Within 24-48hrs upon recived the payment.


2. For Tehcnical Drawing will deliver to your e-mail or mail address by 3-6 Days.
------------------------------------------------------------------------------


Mail Address:

ONE AIM SYNERGY SOLUTION
LOT 3A TINGKAT 1, UNIVERSITY PLAZA
88450 KOTAKINABALU SABAH , MALAYSIA

E-Mail: DIRECTOR.ENGINEER@YAHOO.COM